Timeschedule Panel

1.After the schedule is imported, choose “Planned” from the drop -down menu in the bottom panel. When the “Play” button is pressed, the structure of the building can be viewed in 3D according to the planned work schedule.

The current status of the project can be viewed in 3D when the project process is updated from the status area from the ifc detail panel after the schedule is imported. To do this, select “Realized” from the drop -down menu in the bottom panel. Press the “Play” button.

2. “Play” button runs the slider.
3. “Pause” button stops the slider.
4. “Next Day” button moves  slider daily.